Overview
During this Residential Development, Ecoblend® was utilised to deliver cost-effective, high-performance road construction, while reducing environmental impact. Supplied from our Brentford depot, the material enabled improved spread rates, reduced primary aggregate use, and aligned with the client’s environmental priorities.
Project Scope
The project required the construction of new
road infrastructure to serve a large-scale housing
development. Works were delivered over an 11-month
period for the transport infrastructure element, with
housing construction scheduled to continue over a 10-
year time-frame.
Material Requirements
We supplied 3,075 tonnes of Ecoblend CA 6F4 and 1,972 tonnes of MA Type 1, laid to a depth of 300mm. Ecoblend® was chosen due to its:
- Performance in previous projects
- Environmental impact reduction
- Ready availability

Environmental & Economic Impact

Circularity
Equivalent to over 14,022 tonnes of municipal waste diverted from landfill

Cost Savings
30.6% savings in material cost

Material Efficiency
Required 777 tonnes
less material*

Transport Efficiency
Material savings eliminated the need for 78 additional lorry movements
Outcome
The client benefited from reliable delivery performance, optimised material usage, and strong on-site results. The combination of service quality and product efficiency enabled the project to run on time, while supporting environmental objectives
“Service was spot on with large volumes, ordered and delivered on the days requested. Material exceeded expectations in quality and usability – the site team is very happy” – Contractor